Cold Connection

print

Lineage Logistics, Titan Frozen Fruit Project to be Featured at IACSC 2016

Lineage Logistics contracted with Fisher Construction Group to build a 216,777 sq.ft. LEED certified facility, which includes 151,000 sq. ft. of cold storage and dock space, and 65,000 sq. ft. dedicated to onsite food processing for Lineage’s tenant Titan Frozen Fruit. With the capacity to blast freeze 1 million pounds of product per day, the facility will play a major role in meeting the expanding food processing needs in the Santa Maria, California region. One of the more unique factors of the project is the shared resources and expertise between the third-party logistics company and the food processor. This project will be featured as a keynote presentation during the Opening General Session at the 36th IACSC Conference & Expo, taking place November 10-12 in Fort Lauderdale, Fla.

lineage-w_titan3

Titan Frozen Fruit’s new cold storage and strawberry processing facility. Santa Maria, California

Leave a Reply

Your email address will not be published. Required fields are marked *